City Tower : 

Demolition of two existing buildings and reconstruction of a new project with a strong identity, ideally located in the entry of the city.

Construction of a  tower for luxury housing, overlooking the Meuse and the wooded hills.
The thirty-storey building will be a real landmark for the downtown Seraing.
Offices for a public institution will take place in the lower floors. The upper floors will be occupied by luxury private and public apartments.
800 m² for equipments will separate the two functions.
A private parking will serve the whole site.

The place is highly visible and accessible, close to the highway (Liege, Brussels, Aachen, Maastricht), with public transport nearby (bus + train), 10 minutes from the Calatrava Liege Station and from Liege Airport.

The city of Seraing takes in charge the demolition of existing buildings and cleaning of the site.

Property owner and developer: City of Seraing 

 

Surface area

  • Land: 12.000 m²
  • Offices: 4.500 m²
  • Housing: 10.600 m²
  • Equipment: 800 m²
  • Private Parking

 

Timing

Ongoing feasibility study
Demolition market to be launched
Design, build and financial market to be launched
Planning permit to be obtained

 

Foncier

City of Seraing 

 

Searching for 

Investors for offices, housing, equipment, parking

Project location

City of Seraing - B-4101 Seraing

Eriges
Valérie Depaye
+32 497 46 16 32
vdepaye@eriges.be
ERIGES www.eriges.be

  • Share