Master plan les rives de Charleroi:
On both sides of the Sambre, this master plan integrates the Left Side Business Park (35.500 m² offices/ 33.500m² accommodation) and a boat station that will accommodate the bus boats providing the connection with a large P+R parking lot, East of the City.
Public actors (PAC, Ville de Charleroi, OTW, SPW and SNCB) have combined their efforts to develop a cycle-pedestrian route and a large park along the Sambre, to the west of which a skate park will be built.
A new bus station will take place in front of the train station, whose esplanade will be reconfigured. A new under-track corridor will connect a planted car park refurbished on the Villette side, served by a new ramp from the R9.
The former postal sorting will continue to develop and act as a catalyst by bringing together industrial companies, start-ups, universities, research and training centres to stimulate value creation in the field of engineering.
Surface area
51,40 Ha
Seeking
Partnership & investors
Property owner
Mix
Architect
MSA
Location
Charleroi, 6000